Popular
End of Day Shut Down
- 65 views
Target Completion Time: 15-20 Minutes
Please follow these steps after machine use is completed for the day.
Ensure DD104 is properly assembled for production.
Click Here For Assembly Instructions
Please follow these steps after machine use is completed for the day.
- Step 1 – Turn OFF machine and unplug the power source from the wall.
- Step 2 – Drain the air compressor and air filter.
- Air Compressor Guide – Click Here
- Air Filter Guide – Click Here
- Step 3 – Disassemble Unit To Clean
- Disassembly Procedure – Click Here
- Step 4 – Clean The Unit
- Cleaning Procedure – Click Here
- Step 5 – Reassemble / Ready For Next Use
DO NOT TOGGLE POWER SWITCH TO OFF POSITION IF COMPRESSOR IS RUNNING
NOTE: DRAIN THE AIR COMPRESSOR DAILY

